Florida, USA•Data center infrastructure•United States + Canada
Firoli Group / Infrastructure Supply

Built for
what's next.

One sourcing desk for the physical systems behind modern data centers. Cabinets, power distribution, cooling support, connectivity and facility components—specified for your project, sourced for the US and Canada.

Explore equipment ↗
01 / 04   Infrastructure that scales with the projectScroll to explore   ↓
01 / PowerElectrical distribution
02 / ThermalCooling infrastructure
03 / NetworkConnectivity systems
04 / FacilityRacks + physical plant

Equipment / 01

Everything around
the critical load.

Browse the systems we can source and configure. Final availability, manufacturer, specifications, certifications and delivery terms are confirmed in each written quote.

PWR / 01ϟ

Rack power distribution units

Basic, metered and monitored rack PDUs for cabinet-level distribution and capacity planning.

1-phase / 3-phaseVertical / horizontalOutlet mix
PWR / 02▱

UPS systems & batteries

Online UPS, battery cabinets and replacement battery programs sized around load and runtime.

kVA sizingRuntimeBattery chemistry
PWR / 03⌁

Switchgear & distribution

Power panels, breakers, transfer equipment and busway components matched to project drawings.

One-line reviewVoltageAmpacity
RCK / 01▥

Server & network cabinets

Cabinets, frames and accessories specified around U-height, depth, load, airflow and access.

42U / 48U / customDoors & panelsStatic load
RCK / 02⌑

Aisle containment

Hot- and cold-aisle doors, roof panels, blanking and sealing elements for airflow control.

Hot / cold aisleModularSite dimensions
RCK / 03⊞

Rack accessories

Rails, shelves, blanking panels, brush strips, vertical managers and cable pathways.

Mounting kitsAirflow controlCable routing
THM / 01❄

In-row & room cooling

Close-coupled and room-level cooling equipment scoped to heat load and site architecture.

Heat loadAir / liquidRedundancy
THM / 02◉

Liquid cooling infrastructure

Distribution units, manifolds, hose assemblies and containment components for qualified designs.

CDUManifoldsLeak control
THM / 03≈

Airflow components

Fans, filters, floor grilles, seals and air-management hardware for facility retrofits.

Airflow pathRetrofitService parts
NET / 01◇

Fiber infrastructure

Patch panels, trunks, cassettes and cable assemblies defined by connector, count and reach.

OS2 / OM4 / OM5MPO / LCTest reports
NET / 02⟷

Copper connectivity

Structured cabling, patch panels, cords and termination hardware for planned deployments.

Cat 6 / 6ALengthsLabeling
NET / 03⧉

Transceivers & interconnects

Optics, DAC and AOC interconnects sourced against exact platform compatibility requirements.

SpeedReachCompatibility
FAC / 01⊙

Monitoring & sensors

Temperature, humidity, leak, access and power-monitoring devices for facility visibility.

Sensor mapIntegrationAlarming
FAC / 02▣

Security & access hardware

Cabinet locks, door hardware, cameras and physical access components for approved designs.

Rack / roomAccess controlAuditability
FAC / 03△

Fire & life-safety components

Detection, suppression and supporting hardware for licensed design and code review.

Project codeApproved designSubmittals

Equipment categories describe sourcing scope, not stocked inventory or an offer of a specific certified model. Written quotes establish exact products and terms.

Solutions / 02

One project.
One supply view.

From a single replacement part to a multi-site bill of materials, we organize the equipment request around your engineering intent: exact specifications, acceptable equivalents, quantities, delivery windows and documentation.

01Project BOM and cross-reference sourcing
02Private-label and custom fabrication inquiries
03Consolidated quotes with clear exceptions
04US and Canada project coordination
Discuss a project ↗

Our process / 03

Specified precisely.
Quoted transparently.

We start with the requirement, not an assumed substitute. Every response should make the product, scope and open questions easy to evaluate.

01

Define the requirement

Share a BOM, drawing or short brief with quantity, site, timeline and non-negotiable specifications.

02

Source & compare

We prepare options against the same scope and identify deviations that need engineering review.

03

Review the quote

Confirm manufacturer, documentation, commercial terms and delivery before any commitment.

04

Coordinate supply

After approval, track the order, documents and delivery milestones against the agreed terms.

Start a conversation / 04

Tell us what
you need to build.

Send a part list, a facility package or a single hard-to-source item. We’ll help define the quote request and identify what must be confirmed.

Firoli Group / Supply Desk
sales@firoligroup.com ↗+1 (437) 985-0846 ↗Florida, USA · Serving projects across the United States and Canada.
Project specifications and written quotations govern availability, pricing and delivery.